EnglishРусский
JSC ZAVKOM has finished delivery of vessel and column equipment

JSC ZAVKOM has finished delivery of vessel and column equipment to Combined Oil Refining Unit “EURO+” at Gazpromneft Moscow Refinery. 85 items of vessel equipment were shipped with total weight of 1 350 tonns, diameter up to 6 500 mm., length of the straight part of the shell up to 27 100 mm. 12 items of column equipment have been shipped in fully assembled condition with total weight of 540 tons, diameter up to 3200 mm. and length up to 70 000 mm.
Equipment has been designed and manufactured according to ASME and GOST standards. During manufacturing steel SA-516 Grade 60 HIC has been applied which is in full compliance with HIC resistance requirements stated in the supply specification.